Tema de trabajo aprobado
ISO/AWI 24695
Oil and gas industries including lower carbon energy — The effects of High Voltage DC interference to buried pipelines — Measures to be implemented
Reference number
ISO/AWI 24695
Edition 1
Tema de trabajo aprobado
ISO/AWI 24695
88001
Un grupo de trabajo ha preparado un borrador.

Resumen

This document describes technical measures to be carried out at crossings and parallelisms of buried metal pipelines influenced by HVDC systems. It provides guidance on how the design, construction, operation, maintenance, and decommissioning phases of HVDC systems affect buried metal pipelines. Electrical interference conditions (AC and DC) to pipeline systems are described, and acceptable levels of interference are discussed. Minimum separation distances are recommended. The following aspects are not covered in this document: -Contractual responsibilities -Personnel safety

Informaciones generales

  •  : En desarrollo
    : Nuevo proyecto registrado en el programa de trabajo TC/SC [20.00]
  •  : 1
  • ISO/TC 67/SC 2
  • RSS actualizaciones

¿Tiene alguna duda?

Consulte nuestras Ayuda y asistencia